Projects

A New Technology and Arts Building Reconnecting School and Landscape

Project facts

Location:  Whittlesea, VIC
Client:       Victorian School Building Authority
Stages:      AMP2– Completion
Area:         980m2
Team:       TANDEM, Pollen Studio, Intrec Management, Sheer Consulting, BRT Consulting, Adams Consulting Engineers,
Date:         2023-2026

Scope

  • Work with existing school to create a new masterplan
  • Identify existing buildings to be redeveloped, retained and
    demolished
  • Design new STEAM building in line with masterplan
  • New Fitness Centre in existing building
  • Minor works to improve existing Science building

 

Objectives

  • Rationalise and organise the school’s occupation, maintennance
    and growth into the extensive and expansive school campus
  • Create intimate, weather protected spaces within the larger
    campus
  • Enhance the sense of connection to the landscape and sense of
    belonging
  • Create a sensible pattern of future growth that builds on
    previous patterns of development
  • Foster the idea of a school ‘Heart’

Challenges

  • Reconciling phases of previous growth that both adhere to and
    ignore the school’s prior masterplans
  • Creating spaces that provide a clear identity, foster community
    and provide shelter within the extensive school campus
  • Celebrate the campus’ natural bush setting

 

Outcomes

  • New school masterplan based on a system of courtyards
    enclosed by simple, rectangular buildings, added in future
    phases of growth
  • Strong sense of identity and connection to the natural
    environment
  • New STEAM building that fuses digital, traditional arts and
    modern manufacturing methods in a sunlit, modern building
    connected to the natural setting
  • New STEAM courtyard providing sheltered outdoor space for
    students and teachers