H2o Architects were commissioned by Major Projects Victoria to redevelop the former Bob Jane Stadium and its environs as part of a state government initiative to reinvent the Albert Park complex as a major sporting centre.
TANDEM were engaged by H20 to undertake design development and documentation of the north stand at new Lakeside Stadium; the hub of the precinct.
Objectives
We were asked to refine the initial concept for the North Stand, a conventional, cantilevered steel structure
Integrate the support functions located in the under-croft area under the seating
As a public building, the stand needed to be of high standard but cost effective at the same time
Challenges
The project had to satisfy the requirements of multiple stakeholders, including MPV, the Victorian Institute of Sport, Athletics Victoria and Parks Victoria, as well as those of the International Association of Athletics Federations (IAAF) and the Fédération Internationale de Football Association (FIFA).
Construction needed to be carried out largely off site
Outcomes
Introducing a folding into the steel roof structure dramatically reduced the steel tonnage required to realise the cantilevered roof
Introducing the pre-cast “V” columns created an iconic form, following the distinct folded forms of the roof
TANDEM’s input created a series of visually distinct, structurally elegant forms for the North Stand